Water Treatment Plant Installations – Winscombe Bristol

Maxim has an ongoing contract with several engineering companies to provide Transport Solutions alongside Contract Lifting across the UK. Here you can see the Maxim Team in action at Winscombe WRC, Max Mill Lane – Bristol. We provided Transport Services to collect – Skid pumps, clean water backwash tanks and vessels from Dover and final position on site.

This project involved in depth planning due to the route into site being extremely tight and the added problem of high voltage overhead power lines. Careful consideration had to be given for transport dimensions and turning circles and the access required for the cranage and lifting equipment. Maxim attended site and carried out meetings with all stakeholders prior to installation ensuring all hurdles were highlighted and overcome eradicating any issues on the day.

Share via

Maxim Accreditations

GET IN TOUCH

Whether your requirements are a simple one-off lift or a multi-crane technical lift, Maxim Lifting Services has the equipment and the know-how to provide a safe, efficient and cost-effective solution for your lifting needs.