This was our first project working for ISG Construction providing Tower Crane Management and Lift Assurance services This was a student accommodation development in the heart of Swansea utilising 2 x Luffing Jib cranes SAEZ SL 320 and SAEZ SLH 190. Maxim ensured all correct permissions were granted and minimum clearances were adhered to due to the proximity of Swansea Rail Station being opposite the project. Along with full operation management, we carried out weekly audits and chaired the lifting operations meetings expressing our findings and recommendations.
Operator recovery and emergency rescue plans were provided along with full training and rescue equipment to implement a recovery. Maxim also provided weekly Mast Climber Inspections to ensure all climbers were in serviceable condition and fit for use along with detailed reports submitted to site management teams.