Providing lifting/handling services to the new BT development in Birmingham City Centre 3 Snow Hill Overbury site. Maxim were tasked with unloading and distributing switchgear from the lower basement across 4 upper floors. This was an extremely tight site with finished floors on all levels, we installed floor protection prior to arrival and utilised a selection of lift and shift kits with a 3-man team to complete these works in 2 days.
On the back of this contract, the client was so impressed with the efficiency and accuracy of our work that we were asked to carry out 3 further visits to maneuver CRAC units and equipment also from the basement to upper levels.