Print Press Installation – Europa Showfreight – Norwich

We were called in by our good friends at Europa Show freight to undertake an offload and installation project in Norwich. The project was a joint effort with Europa providing the logistics to get the print press equipment from the continent with Maxim tasked to offload and position inside the factory.

We conducted numerous site inspections to survey the offload area and routes into the factory with several tight turns and overhead obstructions it required a selection of specialist equipment and labour to locate the 25te sections including a Versa Lift and Hydraulic Gantry Lifting System.

The nature of the equipment meant we had very minimal tolerances in our positioning and no room for misalignment, Maxim again delivered the project on time, on budget, and without a scratch.

Share via

Maxim Accreditations

GET IN TOUCH

Whether your requirements are a simple one-off lift or a multi-crane technical lift, Maxim Lifting Services has the equipment and the know-how to provide a safe, efficient and cost-effective solution for your lifting needs.